<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>The Charge Sheet blog</title><link>https://chargesheet.io/blog/</link><description>Notes from the business of EV charging: what is changing, what it costs, and what I would do about it. Plus a weekly screen of the news that matters.</description><language>en-us</language><atom:link href="https://chargesheet.io/blog/feed.xml" rel="self" type="application/rss+xml"/><item><title>Robotaxis are a new kind of tenant. Price them like real estate.</title><link>https://chargesheet.io/blog/robotaxis-are-a-new-tenant/</link><guid isPermaLink="true">https://chargesheet.io/blog/robotaxis-are-a-new-tenant/</guid><pubDate>Tue, 17 Nov 2026 12:00:00 +0000</pubDate><description>Waymos are filling public fast chargers, California redefines what &quot;up&quot; means, and Blink renames itself Blink Energy.</description><content:encoded><![CDATA[<p>Three things from late October worth your time, and one thing I would do about them.</p>
<h2 id="1-robotaxis-are-a-new-kind-of-tenant">1. Robotaxis are a new kind of tenant</h2>
<p>The <a href="https://www.yahoo.com/news/us/articles/come-droves-robotaxis-hogging-ev-130237419.html" rel="noopener">Los Angeles Times</a> reported on October 30 that Waymo robotaxis are filling public fast chargers in San Diego. One driver told the Times he waited <strong>an hour</strong> and described three Waymos at a station with four spots. EVgo says its San Diego stations are open to everyone, robotaxis included, and it had <strong>120 stalls</strong> set aside for AV companies earlier this year. The city says autonomous vehicles pay the same fees as anyone else. Waymo says it staffs some public sites, tries not to bunch up, and builds its own charging as a market matures. Drivers have made the same complaint in <a href="https://www.ktnv.com/news/local-ev-drivers-say-waymo-robotaxis-hogging-public-charging-stations" rel="noopener">Las Vegas</a>, Nashville and St. Louis (<a href="https://insideevs.com/news/813929/waymo-ev-charging-problem-california/" rel="noopener">InsideEVs</a>).</p>
<p><strong>Why it matters:</strong> robotaxis are a new tenant class, and it doesn't really exist yet. They aren't a traditional fleet. A delivery fleet needs warehouse space and not as much infrastructure. They aren't a taxi company either, which needs a repair shop and driver facilities. A robotaxi needs to be in an urban environment so it can reach riders, and it needs a heavy dose of charging.</p>
<p>So how do you price them? I wouldn't price them any differently from the guy camped at the Starbucks table. Real estate is real estate, and the price should depend on demand. Start with how real estate is priced in that area, then adjust and modulate based on market demand.</p>
<p>The bigger point is for landlords. If they want to keep up, charging has to be baked into the underlying asset. That gives fleets in general a foothold for the future, so it future-proofs both sides. That could even carry a premium. It depends on how the infrastructure gets built out.</p>
<h2 id="2-california-says-up-means-it-charged-that-s-a-start">2. California says "up" means it charged. That's a start.</h2>
<p>California's charger reliability rules are <a href="https://www.canarymedia.com/articles/ev-charging/california-ev-charging-reliable" rel="noopener">finally in place</a>. Publicly or ratepayer-funded DC fast chargers installed since January 2024 must hit <strong>97% uptime per port</strong> for <strong>six years</strong>. A port counts as up only when its hardware and software are online, it's available, and it <a href="https://www.energy.ca.gov/programs-and-topics/programs/clean-transportation-program/ev-charger-data-and-reliability-1" rel="noopener">successfully dispenses electricity</a>. Vandalism (up to 10 days per incident), grid outages, natural disasters and up to <strong>72 hours</strong> a year of planned maintenance don't count against it. New DC chargers installed after September 27 must run OCPP 2.0.1 and send the state hourly data. Older ones report twice a year, and the first report is due January 31. One network employee told Canary the rules are an onerous data-reporting exercise.</p>
<p><em>Illustrative. California counts a port as up when it is online, available and dispenses electricity, and requires 97% per-port uptime for six years. The definition on the CEC's page doesn't say how much power counts, so a 150 kW port delivering 75 kW or 40 kW still dispensed electricity. Source: <a href="https://www.energy.ca.gov/programs-and-topics/programs/clean-transportation-program/ev-charger-data-and-reliability-1" rel="noopener">California Energy Commission</a>.</em></p>
<p><strong>Why it matters:</strong> this is a good way to start working toward a practical solution. It doesn't solve the problem right away. Delivering a charge is supposed to mean the charger works, but how much charge? What type? Is it charging at full capacity or at 50% of its rating? If it isn't dispensing, is that a grid limitation, a power reduction, a failed module, or the vehicle?</p>
<p>Enforcement is its own challenge. Unless you can see the OCPP logs in real time, and most people can't, this is a good solution on paper. You can run an application, and the charger still doesn't work.</p>
<p>What needs to happen is integration between the major networks' back ends and public repositories that report whether each port is dispensing, every 24 hours or even every hour. The data costs about the same either way. Hourly data gives a lot more visibility. Tesla does a really good job of this. It tells drivers and Google Maps when stalls are live and when they aren't. Take that model and put it on an open source platform. That takes cooperation, integration and some tech build-out, and it may or may not happen in the time we need it to.</p>
<p>I wrote about why uptime and a working charge aren't the same thing in <a href="https://chargesheet.io/blog/uptime-is-not-success/">Uptime says the charger is online</a>.</p>
<h2 id="3-blink-charging-becomes-blink-energy">3. Blink Charging becomes Blink Energy</h2>
<p>Blink said on October 29 that it plans to rename itself Blink Energy and add energy management and battery storage to charging. The next day it filed an <a href="https://www.sec.gov/Archives/edgar/data/1429764/000149315226049471/forms-3.htm" rel="noopener">S-3</a> with an at-the-market program to sell up to <strong>$100 million</strong> of stock. The filing lists the last sale price at <strong>$0.41</strong> and <strong>145.2 million</strong> shares outstanding, which works out to about <strong>$60 million</strong> of market value. Blink's load-management software runs at <strong>52</strong> of its own DC fast-charging sites, and 26 of them actively use it. One cut its billed peak demand <strong>23%</strong> in its first month (<a href="https://evfleetworld.co.uk/blink-charging-pivots-to-blink-energy-to-drive-battery-storage-and-energy-management-expansion/" rel="noopener">EV Fleet World</a>). Its third-quarter results were scheduled for November 5.</p>
<h2 id="what-i-d-do">What I'd do</h2>
<p>If you own property in a dense part of town, price charging the way you'd price the real estate under it, and adjust to demand from there. Then build the charging into the building itself. Robotaxis are the first tenant to need it at that scale, and they won't be the last.</p>
<p>For fleets and depots, start with the <a href="https://chargesheet.io/fleet-ev-charging/">fleet charging guide</a> and the <a href="https://chargesheet.io/fleet-charging-calculator/">fleet charging calculator</a>. For where a site makes sense, see <a href="https://chargesheet.io/ev-charging-site-selection/">site selection</a>. The <a href="https://chargesheet.io/ev-charger-connectivity/">connectivity guide</a> covers the OCPP side of reliability, and the <a href="https://chargesheet.io/battery-storage-ev-charging/">battery storage guide</a> covers what storage can and can't do about a demand charge.</p>]]></content:encoded><category>robotaxis</category><category>fleet</category><category>pricing</category><category>reliability</category><category>uptime</category><category>networks</category></item><item><title>Tesla is franchising the Supercharger. Charging needs franchise rules.</title><link>https://chargesheet.io/blog/tesla-is-franchising-superchargers/</link><guid isPermaLink="true">https://chargesheet.io/blog/tesla-is-franchising-superchargers/</guid><pubDate>Thu, 12 Nov 2026 12:00:00 +0000</pubDate><description>Tesla built 41% fewer Superchargers last quarter and is letting hosts buy the stalls. That&#x27;s the McDonald&#x27;s play. Now it needs McDonald&#x27;s rules.</description><content:encoded><![CDATA[<p>In the third quarter, Tesla added a net <strong>2,108 Supercharger stalls</strong>. That's <strong>41% fewer</strong> than a year earlier and the slowest third quarter since 2021, per <a href="https://evchargingstations.com/chargingnews/tesla-supercharger-q3-2026/" rel="noopener">State of Charge's read of Tesla's Q3 numbers</a>. In the same quarter, the network logged a record <strong>69 million sessions</strong>, up <strong>29%</strong> (<a href="https://evchargingstations.com/chargingnews/tesla-supercharging-q3-2026/" rel="noopener">State of Charge</a>).</p>
<p>Paren's count points the same way. Tesla built only <strong>34%</strong> of the new US fast-charging ports in Q3, and its share of all US ports slipped below half, to <strong>49.3%</strong> from 54.3% a year ago (<a href="https://www.evinfrastructurenews.com/charging-installation/us-fast-charging-network-q3-2026-tesla-market-share" rel="noopener">Paren via EV Infrastructure News</a>).</p>
<p><em>Tesla's Supercharger network, third quarter 2026 compared with third quarter 2025, indexed to 100. Net new stalls fell 41% (2,108 in Q3 2026). Charging sessions rose 29% to a record 69 million. Sources: <a href="https://evchargingstations.com/chargingnews/tesla-supercharger-q3-2026/" rel="noopener">State of Charge</a> from Tesla's Q3 2026 update; <a href="https://evchargingstations.com/chargingnews/tesla-supercharging-q3-2026/" rel="noopener">State of Charge</a> on sessions.</em></p>
<p>Less building, more use out of what's already there, and a program where somebody else pays for the new stalls. That isn't Tesla losing interest in charging. That's Tesla going McDonald's.</p>
<h2 id="tesla-doesn-t-want-to-sell-electricity">Tesla doesn't want to sell electricity</h2>
<p>Tesla doesn't want to sell electricity to cars any more than McDonald's wants to flip hamburgers. It still wants to be part of the conversation, and it built something that's really good: the Supercharger network. Early on, Tesla owned the sites and partnered with people to get them built. Now it's letting qualified people take the program and run with it.</p>
<p>That program is <a href="https://www.tesla.com/learn/supercharger-for-business" rel="noopener">Supercharger for Business</a>, launched in <a href="https://driveteslacanada.ca/news/tesla-opens-supercharger-for-business-program-letting-companies-buy-and-host-their-own-chargers/" rel="noopener">September 2025</a>. The host buys at least four posts, pays for installation, sets the price and keeps the site clean. Tesla designs the hardware, monitors the site around the clock, services it, answers the driver hotline and puts it in the navigation. For revenue sites, Tesla takes an all-inclusive <strong>$0.10/kWh</strong>, according to <a href="https://electrek.co/2026/04/08/tesla-supercharger-for-business-configurator-pricing/" rel="noopener">Electrek's look at the configurator</a>, which put a standard eight-post V4 site at about <strong>$940,000</strong> installed. That dime is the royalty.</p>
<p>When I was running chargers, we never really wanted to sell chargers. It was always own and operate, to a degree. But at some point you're not just owning chargers and operating them. You're owning the brand, and the person on site is the franchisee.</p>
<h2 id="the-mcdonald-s-play">The McDonald's play</h2>
<p>About <a href="https://corporate.mcdonalds.com/corpmcd/franchising-overview.html" rel="noopener"><strong>95%</strong> of McDonald's restaurants</a> are owned and operated by independent local business owners. McDonald's still owns the IP and the product, and in reality it's still running the system. Others do the grunt work. Early on McDonald's ran the restaurants itself. Over time it figured out there are plenty of people willing and able to run them, so why not let them and take a share off the top? Margin is margin.</p>
<p>Tesla is doing the same thing, and I think it's the smart play. It's the natural next step in scaling. You want to keep a relatively narrow lane in operations so things don't go bad when you spread too thin. Letting others play a part, while you keep a well-producing product, fortifies the business. Tesla keeps building the brand and stays in the business, at a high level: owning assets and contracts that produce cash flow without as much input, instead of carrying the full capex and opex rigor of owning and operating everything end to end.</p>
<h2 id="good-for-hosts-not-for-every-host">Good for hosts. Not for every host.</h2>
<p>Is this bad for hosts who want to own and operate? No. A Tesla-branded station is a solid way to get charging up and running, with a brand drivers already trust.</p>
<p>But not everyone can run a McDonald's, or a Taco Bell, or a hotel, or a gas station. Producing cash flow doesn't make it a sure winner out of the gate. There's still a lot of operating to do. You have to be in the trenches, pushing things forward. That was fine for Tesla early on. At some point it becomes a lower priority for them, which is the whole point of handing it to you. And a new site <a href="https://chargesheet.io/blog/utilization-ramp/">doesn't get ten sessions on day one</a>.</p>
<h2 id="what-s-missing-the-franchise-rules">What's missing: the franchise rules</h2>
<p>Every franchise worth buying into has a bar to clear. McDonald's generally wants <a href="https://www.mcdonalds.com/us/en-us/faq/can-you-still-get-a-mcdonald-s-franchise--in-the-united-states--and-how-much-does-it-cost.html" rel="noopener"><strong>$500,000</strong></a> of non-borrowed personal money just to consider you, and its <a href="https://corporate.mcdonalds.com/corpmcd/franchising-overview.html" rel="noopener">corporate franchising page</a> now says <strong>$750,000</strong>, plus significant business experience. Then comes <a href="https://mcdonalds.com/content/dam/sites/usa/nfl/us-franchising/McDonalds-Franchisee-Overview-One-Sheeter.pdf" rel="noopener"><strong>6 to 12 months</strong></a> of training. Gas works the same way: <a href="https://www.convenience.org/topics/fuels-and-energy/who-sells-americas-fuel" rel="noopener">about 55%</a> of US stores that sell fuel are single-store operators, many under a big brand's canopy. Hotels, Valero, Shell: same idea.</p>
<p>I don't see that with Tesla. Its <a href="https://www.tesla.com/learn/supercharger-for-business" rel="noopener">program page</a> lists no liquidity, experience or site requirements. I don't see it with any charging brand, really. And at some point it's going to have to happen, because this is no different from a gas station brand, a hotel brand or a Taco Bell. It's owning and operating an asset that carries somebody else's brand.</p>
<p>What I'd want in a charging franchise agreement:</p>
<ul><li>Experience owning and operating sites. This is the key one.</li><li>Enough liquidity to sustain the burn for two, three, four years, whatever it takes to ramp.</li><li>Strict brand standards: batteries where they make sense, cleaning service, proper striping, proper lighting.</li><li>Placement rules, so nobody stacks stalls in a bad spot or one on top of another.</li></ul>
<p>This isn't about thinning the herd or keeping people out of the market. It's about tightening who gets access, so the people who get in can keep the brand alive and serve the customers who keep it alive. Requirements like these keep the hosts and the brand afloat by protecting the impression of the product and keeping it consistent from site to site. That's where charging needs to head if we want it to keep growing in a good way.</p>
<h2 id="what-i-d-do">What I'd do</h2>
<p>If you're looking at Tesla-branded stalls, or any branded program, hold yourself to the franchise bar even though nobody is asking you to clear it yet:</p>
<ul><li>Have cash set aside for two to four years of ramp, on top of the build.</li><li>Be honest about whether you've run a site before, or who on your team has.</li><li>Budget for the lighting, striping and cleaning a franchisor would demand.</li><li>Get the money lined up the way a franchisee would. Lenders <a href="https://chargesheet.io/blog/nobody-lends-on-a-charger/">already treat you like one</a>.</li></ul>
<p>The <a href="https://chargesheet.io/ev-charging-business-model/">business model guide</a> covers own-and-operate versus hosting, the <a href="https://chargesheet.io/ev-charging-site-selection/">site selection guide</a> covers placement, and the <a href="https://chargesheet.io/ev-charging-utilization-forecast/">utilization forecast</a> takes your own numbers for the ramp.</p>]]></content:encoded><category>tesla</category><category>superchargers</category><category>franchising</category><category>site-hosts</category><category>operations</category></item><item><title>Nobody lends on a charger. They lend on you.</title><link>https://chargesheet.io/blog/nobody-lends-on-a-charger/</link><guid isPermaLink="true">https://chargesheet.io/blog/nobody-lends-on-a-charger/</guid><pubDate>Tue, 10 Nov 2026 12:00:00 +0000</pubDate><description>The worst loan I was offered for a charging site was 22% over two years, with my house as collateral. Here&#x27;s why, and what actually gets financed.</description><content:encoded><![CDATA[<p>The worst loan offer I got for a charging site was about <strong>22% interest on a two-year term</strong>. On top of that, they wanted <strong>50% or more down</strong>, plus collateral. My house, among other things.</p>
<p>That's the extreme. What I usually see runs from about <strong>12%</strong> on the low side to about <strong>20%</strong> on the high side. The low side comes with a personal guarantee. The high side comes without one, but you still need some existing lienable asset, like cash flow from another business, before anyone will write the loan. You seldom see money lent to individuals for charging stations, especially people without an established business or a line of credit.</p>
<p><em>Interest rates for building a charging site. Fastned's retail bonds sold to its own drivers: 6%. Loans I've seen for public charging: about 12% with a personal guarantee, about 20% without one, and the worst I was offered: about 22% over two years with 50% or more down plus collateral. Sources: my own loan quotes; Fastned via <a href="https://www.electrive.com/2026/10/16/fastned-increases-charging-revenue-and-accelerates-network-expansion/" rel="noopener">electrive</a>.</em></p>
<h2 id="why-lenders-treat-charging-as-high-risk">Why lenders treat charging as high risk</h2>
<p>It comes down to merchant risk. You can forecast the cash flow and make it look rosy. The reality is that charging is still an early business. It isn't proven from a cash-flow standpoint the way a gas station, a convenience store or an existing McDonald's is.</p>
<p>For a public site, nobody can guarantee the utilization, so in the eyes of a lender the risk is close to infinite. Nobody has figured out how to calm a lender down about that on the public side. Fleet charging is different. A depot can reduce merchant risk with contracts for utilization. A public charger on a corner can't.</p>
<h2 id="the-horror-stories-are-about-business-lending-not-charging">The horror stories are about business lending, not charging</h2>
<p>I think a lot of the horror stories about people not getting financing come from people who don't understand how business financing works.</p>
<p>The hotel, the Dunkin' Donuts and the Taco Bell you drive past that were financed through an SBA program all required someone to put up their own capital and personally guarantee the loan. That's the rule, not a special punishment for charging. Under the <a href="https://www.law.cornell.edu/cfr/text/13/120.160" rel="noopener">SBA's own regulations</a>, anyone holding <strong>20% or more</strong> of the business generally has to guarantee the loan. What lenders ask of a charging station isn't any different.</p>
<p>The difference is the comparables. A Taco Bell can't guarantee its sales any more than a charger can guarantee its utilization. But there's enough volume and demand out there, and enough data from franchisees that were already financed and are showing success, that a lender can reasonably assume it. Charging doesn't have that pile of comparables yet.</p>
<h2 id="sba-works-if-you-show-up-as-a-business">SBA works if you show up as a business</h2>
<p>I've seen a lot of success with SBA loans for charging. But you have to frame it as a business. You need comparables. And you still need skin in the game: some personal liquidity, and some of your own business capital up front.</p>
<p>SBA is a great way to get hotels and assets like that up and running, and charging is one of those assets. It just isn't a way around putting your own money in.</p>
<h2 id="or-skip-the-bank-entirely">Or skip the bank entirely</h2>
<p>Dutch operator Fastned found another way. It pays for part of its build with five-year retail bonds sold to its own customers at <strong>6%</strong>, about <strong>€337 million</strong> raised by June (<a href="https://www.electrive.com/2026/10/16/fastned-increases-charging-revenue-and-accelerates-network-expansion/" rel="noopener">electrive</a>). Its stations are bringing in about <strong>€395,000 a year each</strong> so far in 2026 (<a href="https://www.renewableenergymagazine.com/electric_hybrid_vehicles/fastned-accelerates-build-pace-as-q3-revenue-20261015" rel="noopener">Renewable Energy Magazine</a>). I covered the quarter in <a href="https://chargesheet.io/blog/flat-utilization-is-a-good-sign/">an October roundup</a>.</p>
<p>If you've ever put down a deposit to reserve a Rivian or a Lucid, or backed something on Kickstarter, you've already lent a company money, at 0%. Fastned pays its drivers 6%. Paying 6% to build a revenue-producing asset is pretty good. Compared with the 12 to 22% above, especially with inflation where it is, 6% is golden.</p>
<p>It also changes who carries the merchant risk. When the driver is the lender, the lender is also the user. That takes a lot of the fear out of it, and it lets the operator set the terms instead of the bank.</p>
<p>Would it work in the US? Maybe. It's crowdfunding, and there are compliance challenges to work out before anyone makes it routine here. But I applaud it, and if Fastned keeps working, I expect this kind of creative financing to show up elsewhere.</p>
<h2 id="what-i-d-do">What I'd do</h2>
<ul><li>Plan on putting in your own capital and signing a personal guarantee. Every franchise owner did.</li><li>Bring comparables, not just a forecast. A rosy pro forma isn't proof.</li><li>Go to an SBA lender first, and pitch the site as a business, not a science project.</li><li>If you run a fleet depot, use utilization contracts to take merchant risk off the table.</li></ul>
<p>The <a href="https://chargesheet.io/ev-charging-station-financing/">financing guide</a> covers the main routes, and the <a href="https://chargesheet.io/sba-loan-calculator-ev-charging/">SBA loan calculator</a> takes your own numbers. For comparables, start with the <a href="https://chargesheet.io/ev-charging-benchmarks/">benchmarks page</a>.</p>]]></content:encoded><category>financing</category><category>sba</category><category>site-hosts</category><category>fastned</category></item><item><title>Charging is a business, not a charity</title><link>https://chargesheet.io/blog/charging-is-not-a-charity/</link><guid isPermaLink="true">https://chargesheet.io/blog/charging-is-not-a-charity/</guid><pubDate>Thu, 05 Nov 2026 12:00:00 +0000</pubDate><description>I raised my price 5 cents at a time to 65 cents a kWh and utilization went up. Price for convenience, not for apology.</description><content:encoded><![CDATA[<p>When two of my sites opened, one of them at a hotel, I priced charging between <strong>45 and 55 cents a kWh</strong>. That was roughly what the local Electrify America and Tesla stations charged at the time. I wanted to see how people would react and how they'd use the stations. They used them. Nothing crazy.</p>
<p>Once I had some repeat customers and some stability in utilization, I started raising the price by <strong>5 cents every month or so</strong>. It peaked at <strong>65 cents a kWh</strong>. I've kept it there for about two years. If anything, utilization has gone up.</p>
<p><em>Illustrative, not to scale. Price at two of my sites: opened at 45 to 55 cents per kWh, raised about 5 cents a month to 65 cents, then held there for about two years while utilization went up. Source: my own sites.</em></p>
<p>Have I heard complaints about the price? Yes. I've also watched that same hotel charge <strong>$5 for a bottle of water</strong> you could get at Walgreens if you drove five or ten minutes. Nobody writes the hotel an angry email about the water. The point of a hotel charging experience, and of charging in general, is convenience. I'm pricing for convenience.</p>
<p>If you run a hotel, I've written separately about <a href="https://chargesheet.io/blog/hotel-owner-charger-pitch/">what I'd tell you about a free charger</a>.</p>
<h2 id="the-industry-prices-like-it-s-apologizing">The industry prices like it's apologizing</h2>
<p>A lot of charging is priced as if the operator owes the driver a favor. It doesn't have to be. Charging is inelastic to price. People worry about that more than they should, and the biggest network in the country just showed why.</p>
<p>Paren's <a href="https://www.paren.app/reports/us-ev-fast-charging-q3-2026" rel="noopener">Q3 2026 report</a> has Tesla's average non-member price at <strong>$0.569 per kWh</strong>, up <strong>15%</strong> in a year, and its member price at <strong>$0.396</strong>, up 9%. Everyone else averages about <strong>$0.533</strong> and has been flat for <strong>five straight quarters</strong>. Over the same year, US fast-charging sessions grew <strong>26%</strong>, and Tesla still built about <strong>31%</strong> of the new fast-charging ports added in Q3. Gas, meanwhile, averaged a record <strong>$4.33</strong> a gallon in September, according to <a href="https://gasprices.aaa.com/national-average-dips-following-record-setting-september/" rel="noopener">AAA</a>. I covered those numbers in <a href="https://chargesheet.io/blog/flat-utilization-is-a-good-sign/">an October roundup</a>.</p>
<p>That's supply and demand working. Tesla has a robust system, people want to use it, and of course it's going to charge for it and make a profit. I wouldn't call that the Apple model. I'd call it a sustainable business model. You have to look at charging as a business, not a charity. Charging more because people will pay it helps your bottom line and makes the business more sustainable.</p>
<h2 id="nobody-else-in-retail-apologizes-for-location">Nobody else in retail apologizes for location</h2>
<p>None of this is new. Gas stations don't make much on fuel. Most of the money is in the store. But they still price fuel on traffic and demand. A station on a busy road with no competition charges more than one on a quiet road or one with competition nearby.</p>
<p>A McDonald's in New York City can charge different prices depending on which part of the city you're in. Airports charge airport prices for everything. Yes, costs differ by location, and utility costs have probably gone up for most hosts. But pricing is still pricing. A sustainable business prices on demand.</p>
<p>Charging already does a little of this. In the same Paren report, the average fast-charging price runs from <strong>$0.424 per kWh</strong> in Nebraska to <strong>$0.877</strong> in Hawaii. About <strong>27%</strong> of per-kWh stations use time-of-use pricing, where the peak rate averages <strong>$0.637</strong> and off-peak averages <strong>$0.438</strong>. The other 73% charge one flat price all day.</p>
<h2 id="that-doesn-t-mean-raise-your-price-tomorrow">That doesn't mean raise your price tomorrow</h2>
<p>Does this mean everyone should raise prices? No. Tesla can charge more because it has the utilization and the volume. Most other networks are still building that. Charging shouldn't be a loss-making business. It can be profitable, but you need the utilization and the volume to drive it, and you have to know what's actually driving your demand and what isn't.</p>
<p>Here's how I did it at my sites:</p>
<ul><li>Start at the local market price and see how people react.</li><li>Wait for repeat customers and steady utilization before you touch it.</li><li>Raise it in small steps, about 5 cents a month, and watch what happens after each one.</li><li>Stop where it settles, and hold. Mine has held at 65 cents for about two years.</li><li>Expect a few complaints. Price for the convenience you're actually selling.</li></ul>
<h2 id="what-i-d-do">What I'd do</h2>
<p>If you host chargers and you're still at the price you opened with, look at your repeat customers and your utilization trend. If both are steady, you've probably earned the right to test a small increase. Do it in steps, watch the sessions, and don't apologize for it.</p>
<p>The <a href="https://chargesheet.io/ev-charging-business-model/">business model guide</a> walks through where the revenue in a charging site actually comes from, and the <a href="https://chargesheet.io/ev-charging-benchmarks/">benchmarks page</a> shows what other sites earn. If you're still deciding where to build, the <a href="https://chargesheet.io/ev-charging-site-planner/">site planner</a> takes your own numbers.</p>]]></content:encoded><category>pricing</category><category>site-hosts</category><category>business-model</category><category>tesla</category></item><item><title>Nobody gets ten sessions on day one</title><link>https://chargesheet.io/blog/utilization-ramp/</link><guid isPermaLink="true">https://chargesheet.io/blog/utilization-ramp/</guid><pubDate>Tue, 03 Nov 2026 12:00:00 +0000</pubDate><description>The line in a charging pro forma that everyone gets wrong isn&#x27;t capex or opex. It&#x27;s utilization, and it&#x27;s wrong because it&#x27;s the easiest one to wish up.</description><content:encoded><![CDATA[<p>Ask people what goes wrong in a charging pro forma and they'll talk about hardware prices, installation overruns, utility upgrades. Those are real. They're also the lines you can refine: get quotes, get a second quote, get the utility to put something in writing.</p>
<p>The line almost everyone gets wrong is utilization.</p>
<h2 id="the-assumption">The assumption</h2>
<p>Everyone assumes their site will get three, five, ten cars a day. A forecast from Stable, or whoever did the study, says ten, fifteen or twenty sessions a day, and that number goes straight into the model starting in month one.</p>
<p>A forecast like that describes what a site might do once it's established. It is not a day-one number. On day one you might get one charge a week.</p>
<h2 id="a-charging-site-is-real-estate">A charging site is real estate</h2>
<p>A charging site behaves like any other piece of real estate with a business on it. A coffee shop, a barber shop, a grocery store, a gas station. Nobody opens a coffee shop and expects the line out the door on the first morning.</p>
<p>People have to know it exists. They have to be marketed to. They have to try it, and then trust it enough to plan around it.</p>
<p>The ramp looks like this: at first almost nobody uses it. Then people start noticing it. A few get curious. The site proves it works, consistently. Drivers start routing to it. That consistency is what brings the volume, and it takes time.</p>
<h2 id="one-of-mine">One of mine</h2>
<p>One of my sites took almost a year to go from one session a week to about one a day. Nothing about the hardware changed. EV adoption in the area grew, and people figured out that the site was there, that it worked, and that they could rely on it.</p>
<p>That got it to one or two sessions a day, and three to four on a weekend. Today it does two to three a day. The whole ramp took two to two and a half years.</p>
<p>Adoption was the main thing. A forecast that shows two to three a day is describing year three, not month one.</p>
<p><em>Illustrative, not a forecast. The forecast is a flat line from opening day. A real site has to earn its way up to it.</em></p>
<h2 id="why-this-line-is-the-one-that-s-wrong">Why this line is the one that's wrong</h2>
<p>Capex and opex are anchored to quotes and bills. Utilization is anchored to nothing but the forecast and your own optimism.</p>
<p>Frankly, it's the lever you can turn to make the model say what you want. Need the payback to hit five years? Add two sessions a day. Nobody can prove you wrong until the site is open, and by then the money is spent.</p>
<p>For context, Paren's <a href="https://www.paren.app/reports/us-ev-fast-charging-q2-2026" rel="noopener">Q2 2026 report</a> put the national average for fast chargers at <strong>15.76%</strong> of the time in use. That average includes sites that have had years to ramp.</p>
<h2 id="what-to-do-about-it">What to do about it</h2>
<p>Model the first year as a ramp, not a flat line. Ask what the site does if it takes twice as long to get where the forecast says it ends up. If the project only works when the forecast shows up on opening day, it doesn't work.</p>
<p>The <a href="https://chargesheet.io/ev-charging-utilization-forecast/">utilization forecast</a> shows every assumption it makes, so you can argue with it. The <a href="https://chargesheet.io/ev-charging-site-planner/">site planner</a> lets you see what your economics look like at the low end, before a customer does it for you.</p>]]></content:encoded><category>utilization</category><category>pro forma</category><category>site planning</category></item><item><title>Uptime says the charger is online. It doesn&#x27;t say it works.</title><link>https://chargesheet.io/blog/uptime-is-not-success/</link><guid isPermaLink="true">https://chargesheet.io/blog/uptime-is-not-success/</guid><pubDate>Thu, 29 Oct 2026 12:00:00 +0000</pubDate><description>A site can report great uptime and still send drivers away. The number that matters is whether the first charge attempt works.</description><content:encoded><![CDATA[<p>Federal rules say a NEVI-funded charging port has to average more than <a href="https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-680/section-680.116" rel="noopener"><strong>97% uptime</strong></a> over a year. Plenty of sites clear that. And J.D. Power's 2026 public charging study still found that <a href="https://www.jdpower.com/business/press-releases/2026-u-s-electric-vehicle-experience-evx-public-charging-study/" rel="noopener"><strong>12% of visits</strong></a> ended without a charge.</p>
<p>Both numbers can be true at the same time, because they measure different things. Uptime doesn't tell you whether a site is good. It tells you whether the charger is online.</p>
<h2 id="what-uptime-actually-measures">What uptime actually measures</h2>
<p>Uptime means the charger is reporting. It's connected to the internet, and the network can see it and show it as ready to charge. That's the charger's opinion of itself.</p>
<p>The federal formula also leaves some things out. Outages caused by the utility, scheduled maintenance, vandalism, natural disasters, and failures that are the vehicle's fault can all be <a href="https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-680/section-680.116" rel="noopener">excluded from the count</a>. Some of those exclusions are fair. None of them help the driver standing at the plug.</p>
<h2 id="where-sessions-actually-break">Where sessions actually break</h2>
<p>The break almost always happens in the workflow: the handoffs between the payment terminal, the network software and the charger. Something in between doesn't go through.</p>
<p>A few ways it goes wrong, every one of them while the charger reports that it's up:</p>
<ul><li><strong>The authorization never arrives.</strong> The card reader asks the network for approval, and the message gets lost between the point of sale, the charging management system and the charger.</li><li><strong>The pre-authorization is too high.</strong> The driver's card only has so much available, the hold the site asks for is bigger than that, and the payment doesn't clear.</li><li><strong>The car gives up waiting.</strong> A driver at a new site opens the charge port, then downloads the app, reads the instructions and figures out the screen. By the time they plug in, the port has timed out. They did everything else right, and it still doesn't charge.</li></ul>
<p>That last one isn't the charger's fault or the network's. It's people not knowing how their cars work, which is normal. It still counts as a failed visit to the driver, and they'll remember your address.</p>
<p><em>Illustrative. Uptime sees whether the charger is online. A session also has to clear the card, the network's approval and the car's handshake, and any of those can fail while the charger reports ready.</em></p>
<h2 id="measure-what-the-driver-sees">Measure what the driver sees</h2>
<p>Uptime is one piece of the puzzle. The number I'd rather see is charge success rate, and especially first-time charge success: of the drivers who walked up and tried, how many got a charge on the first attempt?</p>
<p>That number catches the payment problems, the network problems and the timed-out ports that uptime never sees. Paren's reliability score already goes that way. It <a href="https://www.paren.app/reports/us-ev-fast-charging-q2-2026" rel="noopener">counts successful sessions, retries and failed attempts</a> along with downtime, and most states land in the low to mid 90s.</p>
<p>If I'm honest, I think anything above 80% first-time success is good.</p>
<h2 id="what-to-ask-for">What to ask for</h2>
<p>If you own a site, or you're about to sign with a network to run one:</p>
<ul><li>Ask for session success rate and first-time success rate, not just uptime.</li><li>Ask for the failed sessions broken out by cause: payment declined, authorization timed out, vehicle fault, charger fault.</li><li>Ask what the pre-authorization hold is, and whether it can be set lower.</li><li>Put the instructions where a new driver will read them before opening the charge port.</li></ul>
<p>A charger that's online and doesn't charge is a broken charger with a good report.</p>
<p>The <a href="https://chargesheet.io/ev-charger-connectivity/">connectivity guide</a> covers the communication side, where a lot of these failures start. The <a href="https://chargesheet.io/buying-ev-chargers/">buying guide</a> has a chart of what the uptime report says versus what drivers experienced over thirty days, and the <a href="https://chargesheet.io/ev-charging-benchmarks/">benchmarks</a> show what real sites look like.</p>]]></content:encoded><category>reliability</category><category>uptime</category><category>operations</category></item><item><title>Flat utilization is a good sign</title><link>https://chargesheet.io/blog/flat-utilization-is-a-good-sign/</link><guid isPermaLink="true">https://chargesheet.io/blog/flat-utilization-is-a-good-sign/</guid><pubDate>Tue, 27 Oct 2026 12:00:00 +0000</pubDate><description>Sessions up 26% while utilization held flat, Tesla&#x27;s 15% price increase, and Fastned borrowing from its own drivers at 6%.</description><content:encoded><![CDATA[<p>Three numbers from mid-October worth your time, and one thing I would do about them.</p>
<h2 id="1-sessions-up-26-utilization-flat-that-s-a-healthy-market">1. Sessions up 26%, utilization flat. That's a healthy market.</h2>
<p>Paren's <a href="https://www.paren.app/reports/us-ev-fast-charging-q3-2026" rel="noopener">Q3 2026 report</a> counted <strong>50.4 million</strong> US fast-charging sessions last quarter, up <strong>26%</strong> from 39.9 million a year earlier. National utilization barely moved: <strong>15.9%</strong>, against 16.4% a year ago, and it has stayed between 15.7% and 16.5% for five quarters. The reason is supply. Operators added <strong>4,106 ports</strong> in Q3, and the US now has <strong>80,964</strong>. The top 30 metros run at <strong>21.1%</strong>. Everywhere else runs at <strong>11.0%</strong> (<a href="https://electrek.co/2026/10/13/tesla-still-leads-us-supercharger-growth-but-its-raised-prices/" rel="noopener">Electrek</a> has the same numbers).</p>
<p>All of that happened while new EV sales fell about <strong>39%</strong> from last year's tax-credit rush, according to <a href="https://www.coxautoinc.com/wp-content/uploads/2026/10/Q3-2026-Kelley-Blue-Book-EV-Sales-Report-updated-as-of-10-13-26.pdf" rel="noopener">Cox Automotive</a>.</p>
<p><em>US DC fast charging, Q3 2025 vs Q3 2026. Sessions rose 26%, from 39.9 million to 50.4 million. National utilization went from 16.4% to 15.9%. Source: <a href="https://www.paren.app/reports/us-ev-fast-charging-q3-2026" rel="noopener">Paren, Q3 2026</a>.</em></p>
<p><strong>Why it matters:</strong> I read this as a good sign. Capacity is being built to meet demand, and demand is still growing at a healthy clip. Flat utilization mostly means the sessions are spread across more sites. A new station takes time to ramp, and a lot of these are new, so plenty of them are still in the teething period. This isn't a cliff and it isn't oversaturation. It's how this kind of asset works through its cycle.</p>
<p>If I owned a site pegged at 11%, I would wait. Hold, be patient, and watch how things grow. Look into what adding capacity would take, without spending money on it yet, and plan for the future. There's no reason to get worried or sell.</p>
<h2 id="2-tesla-raised-prices-15-everyone-else-held-flat">2. Tesla raised prices 15%. Everyone else held flat.</h2>
<p>Tesla's average non-member price is now <strong>$0.569 per kWh</strong>, up <strong>15%</strong> in a year. Members pay <strong>$0.396</strong>, up 9%. Non-Tesla networks average about <strong>$0.533</strong> and have been flat for <strong>five straight quarters</strong>. Paren puts the national average at $0.540, up 2.7%, and credits the increase to Tesla. Gas, meanwhile, set a September record of <strong>$4.33</strong> a gallon (<a href="https://gasprices.aaa.com/national-average-dips-following-record-setting-september/" rel="noopener">AAA</a>).</p>
<p><strong>Why it matters:</strong> this is business at its finest. Tesla has a robust system, people want to use it, and of course it's going to charge for it. That's not the Apple model. It's a sustainable business model. Charging is inelastic to price, and Tesla is the proof. That doesn't mean everyone should raise prices. It means you should know what's actually driving your demand and price to it. I'll come back to this one in its own post.</p>
<h2 id="3-fastned-borrows-from-its-drivers-at-6">3. Fastned borrows from its drivers at 6%</h2>
<p>Dutch operator Fastned <a href="https://www.renewableenergymagazine.com/electric_hybrid_vehicles/fastned-accelerates-build-pace-as-q3-revenue-20261015" rel="noopener">reported Q3</a> like-for-like charging revenue of <strong>€46.3 million</strong>, up <strong>47%</strong>, and annualized revenue of <strong>€395,000 per station</strong> so far this year. It's guiding to an operating EBITDA margin of about <strong>45%</strong> for 2026. Part of the build is paid for with five-year retail bonds sold to its own customers at <strong>6%</strong>, about <strong>€337 million</strong> raised by June (<a href="https://www.electrive.com/2026/10/16/fastned-increases-charging-revenue-and-accelerates-network-expansion/" rel="noopener">electrive</a>). It still posted a €13 million net loss in the first half.</p>
<p><strong>Why it matters:</strong> paying 6% to build a revenue-producing asset is pretty good. Banks are bad at lending on public charging because nobody can guarantee the utilization, so to a lender the merchant risk looks infinite. When the driver is the lender, the lender is also the user, and that takes a lot of the risk out. Could it work in the US? Maybe. It's crowdfunding, and the compliance side needs working out. More on this one soon too.</p>
<h2 id="what-i-d-do">What I'd do</h2>
<p>If your site is sitting near 11%, don't sell it and don't panic. Hold, learn what's actually driving the sessions you get, price to that demand, and plan your next stalls on paper before you spend on them.</p>
<p>The <a href="https://chargesheet.io/ev-charging-utilization-forecast/">utilization forecast</a> takes your own numbers on the ramp and the <a href="https://chargesheet.io/ev-charging-benchmarks/">benchmarks page</a> shows what other sites look like. For pricing, start with the <a href="https://chargesheet.io/ev-charging-business-model/">business model guide</a>. For money, the <a href="https://chargesheet.io/ev-charging-station-financing/">financing guide</a> and the <a href="https://chargesheet.io/sba-loan-calculator-ev-charging/">SBA loan calculator</a> cover the conventional routes.</p>]]></content:encoded><category>utilization</category><category>pricing</category><category>networks</category><category>financing</category><category>tesla</category></item><item><title>What I&#x27;d tell a hotel owner about a free charger</title><link>https://chargesheet.io/blog/hotel-owner-charger-pitch/</link><guid isPermaLink="true">https://chargesheet.io/blog/hotel-owner-charger-pitch/</guid><pubDate>Thu, 22 Oct 2026 12:00:00 +0000</pubDate><description>A no-cost charger deal means handing part of your property to someone else&#x27;s business. If you control the land, own the chargers.</description><content:encoded><![CDATA[<p>A hotel owner gets a charger sales pitch. It happens every week somewhere, usually with the words "no cost to you" in the first slide. If I had five minutes with that owner, here's what I'd say.</p>
<h2 id="first-question-what-are-they-actually-selling-you">First question: what are they actually selling you?</h2>
<p>There are two very different products hiding under the word "charging."</p>
<p>One is chargers, installed. You buy them (or finance them), they go in your parking lot, and they are yours.</p>
<p>The other is a service: a company installs chargers on your property at no cost to you and runs them as its business. You get a small cut of revenue or a flat fee, or sometimes just the amenity.</p>
<p>The pitch rarely makes the difference obvious. Figure out which one you're looking at before you look at anything else.</p>
<h2 id="why-no-capex-is-so-tempting">Why "no capex" is so tempting</h2>
<p>The no-capex option sounds like all upside. Chargers show up, guests are happy, you didn't write a check. In a hotelier's head, that's free amenity money.</p>
<p>The reality is you're giving part of your business to someone else to run on your land, when you don't have to.</p>
<h2 id="don-t-sublease-your-parking-lot">Don't sublease your parking lot</h2>
<p>If you own your land, or have a lease that gives you control of it, you have the thing every charging company needs: a site.</p>
<p>When you sign up for the no-cost model, you're effectively subleasing that space to a company to operate on. They set the price. They keep most of the revenue. They decide what happens when a charger breaks. And the deal usually runs for years.</p>
<p>For a business that already controls its land, that trade rarely makes sense anymore.</p>
<p><em>Same parking lot, two deals. In one, the revenue is the operator's and you get a cut. In the other, you pay the loan and the rest is yours.</em></p>
<h2 id="owning-is-easier-than-it-used-to-be">Owning is easier than it used to be</h2>
<p>Charging stations have become easy enough to operate yourself, if you choose the right vendors and give it some time.</p>
<p>The model I'd push a hotel owner toward: find a vendor who will install the chargers and work with you to get the site up and running. Then you own the operations, 100%.</p>
<h2 id="why-hotels-in-particular">Why hotels in particular</h2>
<p>Hotels have two advantages over most charging businesses.</p>
<p>The first is power. A hotel already has an electrical service and a utility bill. The chargers' consumption blends into the property's existing usage, which helps the economics in a way a standalone charging site can't match.</p>
<p>The second is cash flow. A hotel has a different cash flow profile from a startup charging network. It can carry a project like this on its own balance sheet instead of giving away the upside.</p>
<h2 id="paying-for-it">Paying for it</h2>
<p>"No upfront cost" isn't only available from the no-capex company. Financing gets you the same thing without giving up ownership. The cost is amortized over a five, seven or ten-year term, and it fits into your capex or opex budget without much thought.</p>
<p>The <a href="https://chargesheet.io/ev-charging-station-financing/">financing guide</a> walks through the options, and the <a href="https://chargesheet.io/sba-loan-calculator-ev-charging/">SBA loan calculator</a> shows what a payment looks like with your own numbers. The <a href="https://chargesheet.io/ev-charging-site-planner/">site planner</a> puts the whole project together, costs to revenue.</p>
<h2 id="the-hard-part">The hard part</h2>
<p>The hard part is finding a good vendor. That's where asking the right people pays off: other owners who have done it, operators who have lived with the hardware, installers who have seen what breaks.</p>
<p>Whichever route you go, get straight answers to these before you sign:</p>
<ul><li>Who owns the chargers, today and at the end of the contract?</li><li>Who sets the price drivers pay?</li><li>Who keeps the revenue, and how is your share calculated?</li><li>Who pays the electric bill, including demand charges?</li><li>What happens if you want out, sell the property, or need the parking back?</li></ul>
<p>If the answers to most of those are "not you," you're not getting free chargers. You're renting out your parking lot at a discount.</p>]]></content:encoded><category>hotels</category><category>site hosts</category><category>financing</category><category>ownership</category></item><item><title>Half the cables should still be CCS</title><link>https://chargesheet.io/blog/half-the-cables-still-ccs/</link><guid isPermaLink="true">https://chargesheet.io/blog/half-the-cables-still-ccs/</guid><pubDate>Tue, 20 Oct 2026 12:00:00 +0000</pubDate><description>Ionna opened its first NACS-only sites, the Tesla Semi hit volume production, and Colorado funded 270 fast-charging ports.</description><content:encoded><![CDATA[<p>Three things from late September worth your time, and one thing I would do about them.</p>
<h2 id="1-ionna-went-nacs-only-i-wouldn-t-yet">1. Ionna went NACS-only. I wouldn't, yet.</h2>
<p>Ionna opened its first fast-charging sites with <strong>no CCS1 cable at all</strong>: two Rechargery Relay locations at Circle K stores in Lancaster and Perris, California, with <strong>4 NACS stalls each</strong>, <a href="https://evchargingstations.com/chargingnews/ionna-first-all-nacs-charging/" rel="noopener">reported by State of Charge</a> on September 22. Ionna's <a href="https://www.ionna.com/rechargery/perris-ca-rechargery-circle-k-n-perris-blvd/" rel="noopener">Perris page</a> lists four NACS connectors at up to <strong>400 kW</strong> for <strong>$0.39 per kWh</strong>. Ionna hasn't said why.</p>
<p>For scale, Paren's <a href="https://www.paren.app/reports/us-ev-fast-charging-q2-2026" rel="noopener">Q2 2026 report</a> had NACS at <strong>22.9% of new non-Tesla fast-charging connectors</strong> installed last quarter. CCS is still <strong>74.6%</strong> of the 48,371-port non-Tesla base.</p>
<p><em>Non-Tesla DC fast-charging connectors. CCS is 74.6% of the 48,371-port installed base. NACS was 22.9% of new connectors installed in Q2 2026. Source: <a href="https://www.paren.app/reports/us-ev-fast-charging-q2-2026" rel="noopener">Paren, Q2 2026</a>.</em></p>
<p><strong>Why it matters:</strong> we're not close to the point where a third-party site should be NACS-only. A lot of non-Tesla EVs on the road still have a CCS port, and those are the drivers a third-party charger lives on. If I'm speccing four DC stalls for a c-store today, at least half the cables are CCS.</p>
<p>We'll get there in a few years, as more models ship with NACS and people trade their CCS cars in. My line is roughly 80% of new vehicles sold with a NACS port, plus Supercharger lines long enough to push Tesla drivers onto third-party chargers. Parts of California may be close. But unless Ionna knows something about who drives past those two Circle Ks, going NACS-only now doesn't make a ton of sense.</p>
<h2 id="2-the-tesla-semi-is-in-production-adoption-is-the-hard-part">2. The Tesla Semi is in production. Adoption is the hard part.</h2>
<p>Tesla started volume production of the Semi on September 25 at a new plant in Sparks, Nevada, built for <strong>50,000 trucks a year</strong> (<a href="https://electrek.co/2026/09/25/tesla-semi-volume-production-launch-nevada-factory/" rel="noopener">Electrek</a>, <a href="https://techcrunch.com/2026/09/25/tesla-finally-moves-to-electrify-trucking-after-a-decade-of-work-and-delays/" rel="noopener">TechCrunch</a>). Loaded to 82,000 pounds it uses about <strong>1.7 kWh per mile</strong>, and it charges at up to <strong>1.2 MW</strong>, enough for 60% of its range in 30 minutes (<a href="https://www.theautopian.com/the-tesla-semi-finally-enters-mass-production-and-charges-with-enough-juice-to-power-a-small-neighborhood/" rel="noopener">The Autopian</a>). Earlier this year Tesla quoted <strong>$260,000</strong> for the 325-mile Standard Range and <strong>$290,000</strong> for the 500-mile Long Range. Tesla's own math puts electricity at <strong>$0.20 to $0.30 a mile</strong>, against about <strong>$0.80</strong> for a diesel truck at 7 mpg.</p>
<p>Some arithmetic for anyone with a depot: at 1.7 kWh a mile, a truck running 300 miles a day needs about <strong>510 kWh</strong> every night. Ten of them need about <strong>5 MWh</strong>.</p>
<p><strong>Why it matters:</strong> when ZET SCALE ordered 2,500 electric semis, I called it <a href="https://chargesheet.io/blog/electric-semis-no-chargers/">chicken and egg</a>. My answer doesn't change. Production is the chicken now, but adoption is the bigger thing. Tesla producing a truck doesn't mean it gets built at scale, or deployed at scale in time. Trucking is a legacy industry, and new technology that challenges it takes time and a lot of testing before fleets start trading in their diesel trucks. It's a good start. Give it some time.</p>
<h2 id="3-colorado-funds-270-more-fast-charging-ports">3. Colorado funds 270 more fast-charging ports</h2>
<p>Colorado <a href="https://governorsoffice.colorado.gov/news/polis-administration-awards-232-million-fill-gaps-colorados-electric-vehicle-fast-charging" rel="noopener">awarded <strong>$23.2 million</strong></a> on September 22 for <strong>270 fast-charging ports at 35 locations</strong>, using federal NEVI money and the state's Community Access Enterprise. That's about <strong>$663,000 per site</strong>, or roughly <strong>$86,000 per port</strong>. The state says it adds <strong>16%</strong> to a network of more than 1,680 ports.</p>
<p>The winners range from Tesla, Electrify America, EVgo and Blink to 7-Eleven, Love's, Phillips 66 and regional operators like Helios and Red E (<a href="https://krdo.com/news/2026/09/22/colorado-awards-ev-fast-charging-grants/" rel="noopener">KRDO</a>). Projects have two years to finish.</p>
<h2 id="what-i-d-do">What I'd do</h2>
<p>If you're speccing DC chargers for a site today, keep at least half the cables CCS. Revisit that when NACS is on roughly 80% of new EVs sold, or when Tesla drivers start showing up because the Supercharger down the road has a line. Until then, a NACS-only site turns away the drivers third-party charging depends on.</p>
<p>The <a href="https://chargesheet.io/buying-ev-chargers/">buying guide</a> covers hardware and connector choices, and the <a href="https://chargesheet.io/ev-charging-site-selection/">site selection guide</a> helps you figure out who actually drives past your lot. For depots, the <a href="https://chargesheet.io/fleet-ev-charging/">fleet charging guide</a> and <a href="https://chargesheet.io/fleet-charging-calculator/">fleet charging calculator</a> take your own numbers. If you're chasing grant money, start with the <a href="https://chargesheet.io/ev-charging-station-financing/">financing guide</a>.</p>]]></content:encoded><category>nacs</category><category>networks</category><category>fleet</category><category>trucks</category><category>nevi</category></item><item><title>2,500 electric semis ordered, zero chargers announced</title><link>https://chargesheet.io/blog/electric-semis-no-chargers/</link><guid isPermaLink="true">https://chargesheet.io/blog/electric-semis-no-chargers/</guid><pubDate>Thu, 15 Oct 2026 12:00:00 +0000</pubDate><description>The biggest US electric truck order yet says nothing about where the trucks plug in. That is the part that decides whether they beat diesel.</description><content:encoded><![CDATA[<p>Three things from late September worth your time, and one thing I would do about them.</p>
<h2 id="1-2-500-electric-semis-and-nobody-named-the-charging">1. 2,500 electric semis, and nobody named the charging</h2>
<p>A buyers' group called ZET SCALE, run by Catalyst Mobility (formerly CALSTART) with Microsoft and PepsiCo as founding shippers, ordered <strong>2,500 battery-electric Class 8 trucks</strong> with Tesla as the primary supplier and Kenworth, Volvo and RIDE as backups. The trucks go to <strong>ten freight hubs</strong>, including Los Angeles, Dallas, Houston, San Antonio, Chicago, Atlanta and Newark/New York. <a href="https://electrek.co/2026/09/22/tesla-semi-2500-truck-order-zet-scale-largest-us/" rel="noopener">Electrek</a> and <a href="https://www.electrive.com/2026/09/23/us-procurement-alliance-orders-2500-tesla-semi-trucks/" rel="noopener">electrive</a> both say it nearly doubles the electric Class 8 fleet on US roads. <a href="https://www.freightwaves.com/news/tesla-semi-zet-scale-2500-truck-order" rel="noopener">FreightWaves</a> counts <strong>875 zero-emission heavy trucks sold in all of 2025</strong>.</p>
<p>What the announcement doesn't have: delivery dates, or who builds the charging. Tesla held its Semi rollout event at its new Sparks, Nevada factory two days later.</p>
<p><strong>Why it matters:</strong> this is a chicken-and-egg problem with three chickens. Do you build the depot first, wait on the utility hookup, or wait for the trucks to show up? Electric trucks have been "coming" for a long time, and the Semi has been a thing for years without showing up in droves. An order is not a truck on the road.</p>
<p>Then there's the money. Return-to-base trucks at a metro hub are the easy case. The moment these trucks want charging in the middle of nowhere, the utility isn't going to build that for free. Somebody pays the make-ready, and the electricity is likely to cost more where the infrastructure is scarce. That flows into demand charges, into site operating costs, and into the price per kWh you need to recover it all.</p>
<p>Which gets to the only question a fleet actually asks: is this still cheaper than diesel? As much as I'd like to think everyone is doing this for the greater good, it comes down to dollars and cents. FreightWaves puts the 2025 median electric Class 8 at <strong>$411,200</strong> against <strong>$172,500</strong> for diesel. Energy savings have to carry that gap. If early infrastructure costs push energy prices up, the savings shrink right when the fleet is deciding whether this works. It levels out as the infrastructure gets paid down. The first few years are the hard sell.</p>
<p><em>2025 median prices for new Class 8 trucks: $172,500 diesel, $411,200 electric. Source: <a href="https://www.freightwaves.com/news/tesla-semi-zet-scale-2500-truck-order" rel="noopener">FreightWaves</a>.</em></p>
<h2 id="2-california-cuts-charger-red-tape">2. California cuts charger red tape</h2>
<p>Governor Newsom signed <a href="https://www.gov.ca.gov/2026/09/20/governor-gavin-newsom-signs-legislation-to-accelerate-californias-ev-future-expand-consumer-choice-and-strengthen-energy-independence/" rel="noopener">six EV bills</a> on September 20. For people building sites, the three that matter:</p>
<ul><li><strong>SB 969</strong> modernizes inspections so manufacturer-tested chargers get online faster.</li><li><strong>SB 1283</strong> makes streamlined permitting cover the work around the charger: trenching, electrical upgrades, solar canopies and battery storage.</li><li><strong>AB 1820</strong> lowers permitting barriers and fees for charging at apartments and mixed-use buildings.</li></ul>
<p>California says it has more than <strong>20,000 public DC fast-charging ports</strong>, and zero-emission vehicles were <strong>19.1% of new sales</strong> in Q2.</p>
<h2 id="3-new-ev-sales-down-by-half-used-ev-sales-up">3. New EV sales down by half, used EV sales up</h2>
<p>Cox Automotive's <a href="https://www.coxautoinc.com/insights/ev-market-monitor-august-2026/" rel="noopener">August EV Market Monitor</a> had <strong>78,895 new EVs sold</strong>, down <strong>46.9%</strong> from a year earlier and <strong>5.7%</strong> of the market. Used EV sales went the other way: <strong>44,350</strong>, up <strong>14.7%</strong>. Used EVs now sell about as fast as used gas cars, 42 days' supply for both, the first time Cox has seen parity.</p>
<h2 id="what-i-d-do">What I'd do</h2>
<p>If you're a developer pitching one of these fleets, price the energy with the infrastructure in it: make-ready, the utility upgrade, demand charges, amortized over the real term. Then compare cost per mile to diesel, year by year. If electric only wins once the infrastructure is paid down, that is the pitch. Just don't pretend it wins in year one.</p>
<p>The <a href="https://chargesheet.io/fleet-ev-charging/">fleet charging guide</a> covers depot design, and the <a href="https://chargesheet.io/fleet-charging-calculator/">fleet charging calculator</a> lets you put your own numbers in. The <a href="https://chargesheet.io/ev-charging-business-model/">business guide</a> explains how demand charges work.</p>]]></content:encoded><category>fleet</category><category>trucks</category><category>policy</category><category>ev market</category></item><item><title>Why I built The Charge Sheet</title><link>https://chargesheet.io/blog/why-i-built-the-charge-sheet/</link><guid isPermaLink="true">https://chargesheet.io/blog/why-i-built-the-charge-sheet/</guid><pubDate>Tue, 13 Oct 2026 12:00:00 +0000</pubDate><description>Six years of running a charging business, plus the home charging questions everyone asks, written down for the next person.</description><content:encoded><![CDATA[<p>I spent the better part of six years building and running the North American business of a charging company. Product, sales, marketing, hiring, finance, logistics, and a public listing along the way. Most of what I know about charging, I learned by getting it wrong first, or by watching a customer get it wrong with my equipment.</p>
<p>None of that knowledge was secret. It was just scattered: across vendor brochures that were optimistic by design, utility tariff books nobody reads until the first bill, and forum arguments where the loudest person had never owned a site.</p>
<h2 id="what-this-site-is">What this site is</h2>
<p>The Charge Sheet is the thing I wanted on day one, for both sides of the plug. Guides and free tools for charging at home, and for charging as a business: what happens between the car and the charger, what it costs in a garage or across a 20-stall site, and how to get it right. Every assumption is visible.</p>
<p>And yes, the home side is personal. I run a Tesla Wall Connector on its own circuit, with a NEMA outlet as backup. I have opinions about both.</p>
<h2 id="why-it-s-free">Why it's free</h2>
<p>It is not a lead magnet. There is no sales team behind it, nothing to sign up for, and nothing I get paid to recommend.</p>
<p>The goal is simple: more people who understand charging well enough to run it themselves, and a few more who decide driving electric makes sense. If the numbers say it doesn't for you, the site will say that too.</p>
<h2 id="what-this-blog-is-for">What this blog is for</h2>
<p>Two things.</p>
<ul><li><strong>Essays.</strong> Longer pieces on the parts of charging that trip people up: demand charges, site control, financing, reliability, and the gap between what a charger costs and what a charging site costs.</li><li><strong>The week in charging.</strong> A short, opinionated screen of the news that actually matters if you own a site or are thinking about building one. Not every press release. The three or four things worth your time, and what I would do about them.</li></ul>
<h2 id="what-i-would-ask-of-you">What I would ask of you</h2>
<p>If something here is wrong, tell me. If a number looks off, check the <a href="https://chargesheet.io/methodology/">method page</a> and then tell me anyway. The whole point is to be the source people trust because it admits what it does not know.</p>
<p>And if it saves you from one bad site, or one bad panel upgrade, send it to the next person who is about to sign a lease or buy their first EV.</p>]]></content:encoded><category>about</category><category>charging business</category><category>home charging</category></item></channel></rss>
